Three routes to choose from.
24 Miles. Flat ride thru Huntington Beach, Sunset Beach & Seal Beach along PCH.
38 Mile ride down PCH to Bayside then turning at Carnation to connect with Avocado and San Miquel with a water stop at San Miguel Park before going up Bonita Canyon to Anteater and through UCI the Back bay and back up PCH to Huntington Beach. 1000 feet of elevation gain.
64 Mile ride down PCH to Bayside and up Marguerite to San Juaquin Hills and Newport Coast back down to PCH via Pelican Hill, continuing down PCH to Laguna Beach and up Laguna Canyon to El Toro. Turning left onto Moulton to the Irvine Spectrum, Irvine, University Park up Ridgeline to Turtle Rock and then out Shady Canyon to UCI finishing up by going through the Back Bay to PCH and back to Huntington Beach. 2500 feet of elevation gain.